Drilling Results
-
First Atlantic Nickel: Pipestone XL Project Phase 2X Results – RPM Zone Strike Length Doubled to 4km
First Atlantic Nickel reported Phase 2X drilling results from the Pipestone XL Nickel Alloy Project. Drill hole AN-25-08 showed 480 meters averaging 1.35% Ni in magnetic concentrate, yielding 0.12% magnetically recoverable Ni over the interval. This doubled the drill-confirmed strike length to 800 meters within a 4-km target area. Testing also identified potentially recoverable Cr and Co byproducts. Further drilling eastward will optimize testing across the remaining target area, informed by a refined structural model.
-
Omai Gold Intersects 3.08 g/t Au over 25.8m, 6.84 g/t Au over 9.5m, and 1.52 g/t Au over 37.5m at Wenot; Updates on Deep Drilling
Omai Gold Mines announced significant gold intercepts from the 2025 drilling program at the Wenot deposit in Guyana, including 3.08 g/t Au over 25.8m and 6.84 g/t Au over 9.5m. A deep exploration hole reached 1,860m, intersecting the Wenot shear corridor at 1,598m, potentially expanding the deposit at depth. Four rigs are operating, focusing on resource optimization for a Q1/26 PEA and exploring satellite deposits like the Camp Zone and Blueberry Hill trend. 43 drill holes have been completed this year, totaling 23,500m.
-
Orosur Mining Hits 104m @ 6.61g/t Au at Pepas with Infill Drilling
Orosur Mining (TSXV:OMI) announced exceptional drilling results at its Pepas gold prospect within the Anzá Gold Project in Colombia. Highlights include hole PEP047 with 104m @ 6.61 g/t Au from the surface. The company is rapidly advancing towards a NI43-101 compliant Mineral Resource Estimate (MRE) by year-end, drilling approximately one hole per week with 3-4 day lab turnaround. Orosur plans additional studies on metallurgy, mine planning, and logistics to expedite Pepas’s development post-MRE.
-
Premium Drilling Extends Mineralization 315 Meters Below Resource Area, Indicating Scalable Expansion at the Selebi Project
Premium Resources Ltd. announced significant mineralization expansion at its Selebi North Underground project in Botswana. Recent drilling extended the South Limb mineralization by 315 meters beyond the current resource boundaries, with one hole intersecting mineralization over 16.20 meters. BHEM surveys suggest potential for further resource expansion. Assay results are expected in July. The existing resource shows strong grades exceeding 3% CuEq.