Drilling Results
-
Orosur Mining Hits 104m @ 6.61g/t Au at Pepas with Infill Drilling
Orosur Mining (TSXV:OMI) announced exceptional drilling results at its Pepas gold prospect within the Anzá Gold Project in Colombia. Highlights include hole PEP047 with 104m @ 6.61 g/t Au from the surface. The company is rapidly advancing towards a NI43-101 compliant Mineral Resource Estimate (MRE) by year-end, drilling approximately one hole per week with 3-4 day lab turnaround. Orosur plans additional studies on metallurgy, mine planning, and logistics to expedite Pepas’s development post-MRE.
-
Premium Drilling Extends Mineralization 315 Meters Below Resource Area, Indicating Scalable Expansion at the Selebi Project
Premium Resources Ltd. announced significant mineralization expansion at its Selebi North Underground project in Botswana. Recent drilling extended the South Limb mineralization by 315 meters beyond the current resource boundaries, with one hole intersecting mineralization over 16.20 meters. BHEM surveys suggest potential for further resource expansion. Assay results are expected in July. The existing resource shows strong grades exceeding 3% CuEq.