First Atlantic Nickel

  • First Atlantic Nickel: Pipestone XL Project Phase 2X Results – RPM Zone Strike Length Doubled to 4km

    First Atlantic Nickel reported Phase 2X drilling results from the Pipestone XL Nickel Alloy Project. Drill hole AN-25-08 showed 480 meters averaging 1.35% Ni in magnetic concentrate, yielding 0.12% magnetically recoverable Ni over the interval. This doubled the drill-confirmed strike length to 800 meters within a 4-km target area. Testing also identified potentially recoverable Cr and Co byproducts. Further drilling eastward will optimize testing across the remaining target area, informed by a refined structural model.

    1 day ago