Lake Victoria Gold

  • Lake Victoria Gold: Tembo Exploration Update (Q3 2025)

    Lake Victoria Gold (LVGLF) announced its Q3 2025 exploration update detailing Bulyanhulu’s progress on six licenses acquired under the 2021 APA. Highlights include the completion of 94 line-km of GAIP surveying and the commencement of aircore drilling at the Enze target (19 holes, 419m). Diamond and RC drilling are planned for Q4 2025. Project expenditures total US$6.7M of a proposed US$9M. LVG could receive up to US$45M in contingent payments and engaged Atrium Research for services at $3,500/month for 9 months, pending TSXV approval.

    2026年1月2日
  • Lake Victoria Gold: Accelerated Imwelo Area C Drilling with Second Rig Mobilization

    Lake Victoria Gold (LVG) is accelerating drilling at its Imwelo Gold Project in Tanzania by adding a second drill rig. A 24-hole, 4,000-meter program is underway at Area C with the goal of completion by mid-December 2025. The program targets geotechnical data collection, resource conversion, exploration of down-dip extensions, grade control planning, and metallurgical analysis. Initial assay results from the first completed holes are anticipated next week. LVG will provide ongoing updates on the drilling progress.

    2025年11月15日
  • Barrick Gold Continues Successful Exploration at Tembo-Area Licenses in Lake Victoria Region

    Lake Victoria Gold reported exploration updates from Bulyanhulu Gold Mine (Barrick/Twiga owned) on six licenses acquired from LVG. Q2 2025 saw 12 RC holes drilled (1,380m) targeting the granite-greenstone contact, revealing mafic metavolcanics and alteration. LVG may receive up to US$45M in contingent payments based on future discoveries. Barrick will prioritize identified targets in Q3 2025. The drilling confirms geological continuity and validates long-standing interpretations of the belt’s potential.

    2025年11月1日